Public-Private Partnerships (PPPs) in Construction Projects: A Study on the Utilization, Effectiveness, and Challenges in Pakistan
DOI:
https://doi.org/10.61506/01.00047Keywords:
Public-Private Partnerships, construction projects, effectiveness, challengesAbstract
Public-Private Partnerships (PPPs) have emerged as a vital strategy for addressing infrastructure development challenges worldwide, including in Pakistan. This study explores the challenges and effectiveness of PPP models in the construction sector in Pakistan, focusing on critical aspects of regulatory complexity, changing jurisdiction, coordination issues, financial constraints, and the absence of standardized resources. To gauge the effectiveness of different PPP models, the study examines the Build-Operate-Transfer (BOT), Design-Build-Operate-Maintain (DBOM), and Concession Agreement models. The BOT model has proven effective for large-scale infrastructure projects but remains vulnerable to political instability. The DBOM model faces financial and regulatory challenges, while concession agreements may encounter public accountability and stakeholder conflict issues. The study highlights that the choice of an appropriate PPP model in Pakistan should align with project-specific requirements and challenges. It underscores the significance of addressing political risks, regulatory issues, and ensuring transparent communication with stakeholders. In conclusion, the study offers insights into the challenges and effectiveness of PPP models in Pakistan's construction sector. It recommends the need for a coordinated approach among government entities, robust project screening and evaluation, transparent and competitive tendering processes, and thorough project monitoring. Additionally, it calls for the development of comprehensive guidelines and model documents. Future research should consider the contextual variations in different settings to enhance generalizability and employ a combination of data sources to mitigate interview bias. This study contributes to the ongoing discourse on improving PPP implementation in Pakistan, with the potential for broader applicability in similar contexts.
References
Abas, M., Khattak, S. B., Habib, T., & Nadir, U. (2022). Assessment of critical risk and success factors in construction supply chain: a case of Pakistan. International Journal of Construction Management, 22(12), 2258-2266.
Ahmad, U., Waqas, H., & Akram, K. (2021). Relationship between project success and the success factors in public–private partnership projects: A structural equation model. Cogent Business & Management, 8(1), 1927468.
Ahmadabadi, A. A., & Heravi, G. (2019). The effect of critical success factors on project success in Public-Private Partnership projects: A case study of highway projects in Iran. Transport policy, 73, 152-161.
Almarri, K., & Abuhijleh, B. (2017). A qualitative study for developing a framework for implementing public–private partnerships in developing countries. Journal of Facilities Management, 15(2), 170-189.
Asian Development Bank. (2021). Public-private partnership monitor. Asian Development Bank Institute.
Attarzadeh, M., Chua, D. K., Beer, M., & Abbott, E. L. (2017). Options-based negotiation management of PPP–BOT infrastructure projects. Construction management and economics, 35(11-12), 676-692.
Bakhtawar, B., Thaheem, M. J., & Arshad, H. (2022). Sustainable Public–Private Partnership Delivery in Pakistan; Evolution, Barriers, and Way Forward. In Public Sector Reforms in Pakistan: Hierarchies, Markets and Networks (pp. 275-300). Cham: Springer International Publishing.
Bao, F., Chan, A. P., Chen, C., & Darko, A. (2018). Review of public–private partnership literature from a project lifecycle perspective. Journal of Infrastructure Systems, 24(3), 04018008.
Cheng, Z., Yang, Z., Gao, H., Tao, H., & Xu, M. (2018). Does PPP matter to sustainable tourism development? An analysis of the spatial effect of the tourism PPP policy in China. Sustainability, 10(11), 4058.
Cherkos, F. D., & Jha, K. N. (2021). Drivers of road sector public-private partnership adoption in new and inexperienced markets. Journal of Construction Engineering and Management, 147(3), 04020186.
Cui, C., Liu, Y., Hope, A., & Wang, J. (2018). Review of studies on the public–private partnerships (PPP) for infrastructure projects. International journal of project management, 36(5), 773-794.
Fellows, R. F., & Liu, A. M. (2021). Research methods for construction. John Wiley & Sons.
Guo, K., Zhang, L., & Wang, T. (2021). Concession period optimisation in complex projects under uncertainty: a public–private partnership perspective. Construction management and economics, 39(2), 156-172.
Huynh, T. T. M., Dang, C. N., Le-Hoai, L., Pham, A. D., & Nguyen, T. D. (2020). Proposing a strategy map for coastal urban project success using the balanced scorecard method. Engineering, Construction and Architectural Management, 27(10), 2993-3030.
Jayasuriya, S., Zhang, G., & Jing Yang, R. (2019). Challenges in public private partnerships in construction industry: A review and further research directions. Built Environment Project and Asset Management, 9(2), 172-185.
Mangu, S., Annamalai, T. R., & Deep, A. (2021). Comparison of toll and annuity PPPs: A case study of highway projects in India. Built Environment Project and Asset Management, 11(1), 103-120.
Mazher, K. M., Chan, A. P., Zahoor, H., Khan, M. I., & Ameyaw, E. E. (2018). Fuzzy integral–based risk-assessment approach for public–private partnership infrastructure projects. Journal of Construction engineering and Management, 144(12), 04018111.
Memon, S. A., Rowlinson, S., Sunindijo, R. Y., & Zahoor, H. (2021). Collaborative behavior in relational contracting projects in Hong Kong—A contractor’s perspective. Sustainability, 13(10), 5375.
Naveed, F. (2015). Public-Private Partnerships (PPPs) for Infrastructure Development in Developing Countries: A Case Study of Pakistan. The University of Manchester (United Kingdom).
Noor, M. A., & Khalfan, M. (2017). Public private partnership in transport sector projects in Pakistan. International Journal of Critical Infrastructures, 13(1), 70-92.
Osei-Kyei, R., & Chan, A. P. (2017). Factors attracting private sector investments in public–private partnerships in developing countries: A survey of international experts. Journal of Financial Management of Property and Construction, 22(1), 92-111.
Saeed, A. M., Duffield, C., & Hui, F. K. P. (2018). An enhanced framework for assessing the operational performance of public-private partnership school projects. Built environment project and asset management, 8(2), 194-214.
Saha, D., Hong, S. H., Shao, A., Modi, A., & Zemlytska, I. (2018). Private participation in infrastructure (PPI) annual report 2017. Washington, DC: World Bank Group. URL: http://documents. worldbank. org/curated/en/658451524561003915/Private-participation-in-infrastructure-PPI-annual-report-2017.
Soomro, M. A., & Zhang, X. (2015). Roles of private-sector partners in transportation public-private partnership failures. Journal of Management in Engineering, 31(4), 04014056.
Soomro, M. A., Li, Y., & Han, Y. (2020). Socioeconomic and political issues in transportation public–private partnership failures. IEEE Transactions on Engineering Management, 69(5), 2073-2087.
Ullah, F., & Thaheem, M. J. (2018). Concession period of public private partnership projects: Industry–academia gap analysis. International Journal of Construction Management, 18(5), 418-429.
Ullah, F., Thaheem, M. J., & Umar, M. (2017). Public-private partnerships in Pakistan: A nascent evolution. Cambridge Scholars Newcastle upon Tyne, UK.
Ullah, F., Thaheem, M. J., Sepasgozar, S. M., & Forcada, N. (2018). System dynamics model to determine concession period of PPP infrastructure projects: Overarching effects of critical success factors. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10(4), 04518022.
Wang, H., Liu, Y., Xiong, W., & Song, J. (2019). The moderating role of governance environment on the relationship between risk allocation and private investment in PPP markets: Evidence from developing countries. International Journal of Project Management, 37(1), 117-130.
Wang, H., Xiong, W., Wu, G., & Zhu, D. (2018). Public–private partnership in Public Administration discipline: a literature review. Public management review, 20(2), 293-316.
Yong Kim, S., & Thuc, L. D. (2021). Life cycle performance measurement in public–private partnership infrastructure projects. Journal of Infrastructure Systems, 27(4), 06021001.
Zhang, L., Zhao, Z., & Kan, Z. (2019). Private‐sector partner selection for public‐private partnership projects of electric vehicle charging infrastructure. Energy Science & Engineering, 7(5), 1469-1484.
Zhao, N., & Ying, F. (2019). Method selection: a conceptual framework for public sector PPP selection. Built Environment Project and Asset Management, 9(2), 214-232.